From: route@monster.com
Sent: Thursday, April 07, 2016 12:02 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
David Ojobe 6436 S 149th Omaha, Nebraska 68137. davidojobe@hotmail.com
240-464-5304 EDUCATION_________________________________________________________________ THE GEORGE WASHINGTON UNIVERSITY, School of
Business
Washington,
DC
Master of Science, Project
Management
May.2014 ·
Liquidated Damages in Construction Contracts (Course
Project) ·
Best Team Project: Telecommunication Tower Project ·
Member GWU Project Management Student Association PRINCE GEORGE’S COMMUNITY
COLLEGE
Largo,
MD
Certificate, Construction
Management
Dec.2009 ·
Phi Theta Kappa honor Society ABUBAKAR TAFAWA BALEWA UNIVERSITY
Bauchi, Nigeria One of the first five universities of science and
technology established in Nigeria to train highly skilled professionals. Graduate Diploma, Computer
Science
March 2001 ·
Developed Computerized Database System for Nigeria Prison
Service Bauchi Command (Case Study) Bachelor of Engineering, Civil
Engineering
Sept. 1997 ·
Environmental Impact Assessment of Asbestos Factory Liquid
Waste on Ground Water in Bauchi Metropolis ·
Project Management (Course Works)
EXPERIENCE________________________________________________________________ KIEWIT ENGINERING cO. Omaha, NE Operation Support –Planning/Scheduling Engineer
May 2013 –
Present
·
Responsible for implementation of monthly Project Risk
Assessment program for on-going projects at the home office, Omaha ·
Prepared resource loaded Startup interface and
implementation Schedule for the Neal Power Generating Station AQCS –Dry
Filter, Sioux City ·
Prepared the Bid Proposal Schedule for the NYC-DEP Waste
Treatment Carbon Addition Facility in New York City ·
Assisted in the preparation of first phase of the Anchor
Bolt Down Schedule for the Cove Point LNG Project, Houston. Bechtel power inc. Frederick, MD Project Control – Planner/Scheduler
July 2011 –
Feb2013
·
Helped prepared level I schedule for various Nuclear power
plants outage Schedules under supervision. ·
Developed the Level I Master Schedule for the Rio Mesa
Solar Thermal Power Plant System Project in Milestone Professional. ·
Participated in the development of discipline schedules in
Oracle Primavera P6 for Rio Mesa Solar Thermal Power Plant System Project ·
Prepared Resource man-hour and quantity loaded schedule
for Civil Engineering Schedule for the Rio Mesa Solar Thermal Project ·
Coordinated development of the Civil Engineering Schedule
Logics for the Rio Mesa Project. ·
Drafted the activities list for the Early Civil Site works
and Civil Structural Design ·
Responsible for maintaining, creating new activities,
resolving conflicts in the Electrical Engineering and Control System Level 3
& 5 Schedules. ·
Coordinated activities involving other planners and
project team members within and outside United States ·
Maintenance, monitoring and conflict resolution of
activities in the project schedule. ·
Prepared the weekly and monthly progress project schedule
reports. ·
Preparation of project look ahead schedules as requested
by the engineering supervisors ·
Analyzed Critical Path Activities for various engineering
disciplines within the project. ·
Analysis of project schedule to determine critical /long
lead items and their requirement on site ·
Comparative analysis of bulk materials quantities with
other historical projects ·
Assisted in the development of Project Construction
storyboards Genon energy/Dsc inc. Newburg, MD Project Document Controller
February 2008 – December
2010
·
Developed the integrated master schedule for Coal
Barge-Conveyor Delivery Project at Morgantown Power Plant, Newburg MD.
Project Cost: $44M. ·
Reviewed the Wet FGD project contracts to segregate the
contracts into Prime contracts and Owner scope contracts to facilitate
tracking of duties of each responsible party. Project Cost $450M ·
Expedited the bidding process of the Land – Side Conveyor
Foundation by facilitating the estimation process and coordinating with the
Engineering Design firm and the Performing contractor so that the project can
be completed in timely manner. ·
Prepared 3weeks look ahead schedule which enables the
project team members to focus on important activities (activities on the
critical path) and schedule of equipment to plan for. ·
Assisted in setting up the Project Document Control
section, this helped in tracking of the construction documents and provided
easy turnover of the O&M Manuals/As-built Documentations. ·
Aided in interface design of the Coal Barge platform
drainage system and the Conveyor Transfer Tower thus eliminate discharge of
liquid waste into the Potomac River. ·
Facilitated the implementation of the revised lighting
system for the Morgantown SCR platforms by identifying those to be removed
and replaced thus meeting the environmental recommendation from the state. Maiden & Associates
Washington, DC Civil CAD Engineer
April 2007 – December 2007 ·
Conducted preliminary site investigations to verify
existing properties boundaries and to make appropriate recommendations based
on the result of the investigation: City of Capitol Height Community Road
Project ·
Assisted in building quantity take-off from project
drawing to enable accurate estimate of the project ·
Performed Civil, Mechanical and Electrical Calculations to
meet required building code. ·
Assessment of existing office facilities for Enterprise
Car Rental and redesign the facilities to incorporate means of egress. ·
Agip oil company
Port Harcourt, Nigeria Civil
Maintenance Engineer
October 2002 – May 2006 ·
Lead all matters pertaining project management in
Logistics Department within Brass Terminal and all the Flow Stations
operations/and or projects in the host communities. ·
Managed revamping of two crude oil skimmers (Beniboye flow
station and Brass Terminal) within budget and delivered on time without
disruption to the field operations. Project Cost $80,000.00 ·
Developed all drawings and estimates relating to all
contract bidding process within the Brass Terminal and Flow Stations ·
Served as liaison personnel between Agip and contractors
for projects under Logistics Brass Terminal ·
Developed and analyzed and procedure for measuring and
updating weekly work progress on projects ·
Coordinated field activities involving outside team of
engineers (Land Surveyors) and NAOC Brass Terminal operations. ·
Solved water leakage problem in pressure pipe at the
residential quarter by suggesting the use of right chemical compounds with
appropriate curing time, thus saving huge amount of money and need for an
external contractor. SOLANG NIGERIA LIMITED
Port Harcourt, Nigeria Field
Project Engineer April 2001 –
September 2002 ·
Lead – project engineer in charge of the construction of
the Brass Terminal’s New Crude Oil Analytic Laboratory. Project Cost
$420,000.00 ·
Coordinated all the site activities including managing all
the craftsmen on various aspect of the Laboratory construction project. ·
Managed all procurement activities which included
receiving, storage and reports towards the procurement contract close outs. ·
Supervised all the commissioning activities on the
laboratory construction prior to final handing over to AGIP Oil Company ·
Successful construction and completion of the Emergency
Helipad at the NAOC Brass Terminal residential quarters. ·
Supervised installation of the 2 Diesel Holding
Underground Tanks at AGIP’s Port Harcourt. ADDITIONAL
INFORMATION________________________________________________ Languages:English,
Hausa, Yoruba Technical Skills:Oracle Primavera for planning, Primavera Analytics, Autodesk
AutoCAD/drafting, Precision Tree, Stat
Tools, MS Office 2010, MS Project 2007, Primavera Risk, @Risk, Milestone
Professional. Trouble shooting of computer hardware systems, Installation of
computer software programs, Mathematical /Linear Modeling using Excel,
Comparion for Decision Analysis. Interests:Watching
and playing soccer, History of Science. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|